Go to menu Go to content

CASE STUDY: AL MARYAH CENTRAL

Uncategorized @en 19 October 2021

Al Maryah Island | Abu Dhabi | United Arab Emirates

The project involves construction of a 3.1 million ft² mixed-use development, which includes a 2.3 million ft² world-class regional shopping centre anchored by Bloomingdale’s and Macy’s department stores. It has a total of 5 levels, with 4 levels of retail and 1 level comprised of a 20-screen cinema and other family entertainment areas consisting of 400 retail stores, a food market, 145 cafes and restaurants, a premier health club and more than 7,000 parking spaces.

 

Project Group

Lead Architects: Elkus Manfredi Architects, Aecom, Thornton Tomasetti

General Contractor: Brookfield Multiplex

Applicator: Shirawi

 

SOPREMA System

Accessories: ALSAN FLASHINGFLASHING REINFORCEMENT, ALSAN CAP C and ALSAN CAP E

Quantity: 100 000 m²

Duration: January 2014 – March 2015

Status: Completed

 

Structural Particulars

The project involved complicated structural foundations that included waterproofing of horizontal elements and vertical secant piles. The General Contractor chose to use treated plywood as a vertical substrate to fix the COLPHENE BSW V membrane due to site conditions.

Contact your representative

You have questions about our products, systems or services?

Talk with your Sales Rep